The district's Election 2026 mailer

This is the printed "Election 2026" mailer that McKinney ISD sent to voters by mail. This site quotes it for the district's own wording. It is the district's material, not this site's.

This site's copy was made from the printed mailer. Both sides are shown as printed, including the photographs, except that the mailing barcode on the front is covered with a gray bar. A plain-text version of each side follows each image.

Front

Front of the McKinney ISD Election 2026 mailer. The top panel lists Upgraded Facilities, Safety and Security, Growth, and With a Lower Tax Rate. Below it are key dates, a box reading Cut Budget $15 Million, a box reading MISD Administrative Costs run about half the statewide average, and a table titled 5 Proposition Plan. A gray bar covers the mailing barcode. Photographs of people appear in star shapes across the middle.
Front of the mailer. Open the text version below to read it without the image.

Text of the front

McKinney ISD Election 2026

A PLAN DEVELOPED BY OUR COMMUNITY

Key Dates

"Para obtener más información sobre el Bono 2026 y las elecciones, visite mckinneyisd.net." "Learn more about Election 2026" (with a QR code).

5 Proposition Plan

5 Proposition Plan, as printed
BallotWhat it's calledAmountWhat it funds
Prop ARatifies a tax rate of $1.0664M&O rateTeacher salaries and classroom programs
Prop BSchools, Safety & Buses$430.95 millionRenovations, safety & security, two new elementary schools, CTE Center, buses and district vehicles
Prop CInstructional Technology Equipment$62 millionNetwork equipment and replacement of worn out student devices
Prop DExisting McKinney High School Training Pool$4.5 millionPool repairs at existing facility
Prop EMcKinney ISD Stadiums$2.55 millionReplacement of aging stadium turf & track resurfacing

Back

Back of the McKinney ISD Election 2026 mailer. The headline reads The District Lowered the Tax Rate. Voter Approval Funds the Projects. Below it is a two-column table, Currently in McKinney ISD and Bond / VATRE 2026 Will, with rows for each of Props A through E. Photographs of people appear above a banner at the bottom that reads Learn more about the election at mckinneyisd.com.
Back of the mailer. Open the text version below to read it without the image.

Text of the back

THE DISTRICT LOWERED THE TAX RATE. VOTER APPROVAL FUNDS THE PROJECTS

Back of the mailer, as printed
Currently in McKinney ISDBond / VATRE 2026 will
PROP A · VATRE – TEACHERS & CLASSROOMS
McKinney ISD's teacher compensation is compared annually with neighboring and peer school districts.Fund teacher salaries.
After cutting $15 million from the budget, a $6 million deficit remains.Close the final gap without cutting more teachers or student programs.
Class sizes have grown and campus staff has been reduced.Fund salaries for teachers, counselors and instructional aides.
Academic programs and student support services are at risk.Fund the programs and services families rely on every day.
Without additional revenue, the district may need to consider further reductions, including transportation services and student programs.Maintain transportation and student programs.
PROP B · SCHOOLS, SAFETY & BUSES – $430.95 MILLION
HVAC, roofing, electrical and plumbing are past their service life.Replace building systems.
Emergency repairs cost more than planned replacement.Fund scheduled replacement instead of crisis repair.
Surveillance cameras, servers and alert systems are outdated.Upgrade cameras, alerts and emergency communications.
Aging air conditioning, windows, lighting and roofs waste energy.Install efficient systems that lower operating costs.
Frazier, Press and Webb Elementary are at or over capacity.Build two new elementary schools where growth is happening.
Duplicating career training programs at each high school is more expensive and less efficient.Build one shared CTE Center with Collin College.
Collin College was planning a separate CTE facility nearby.Shared CTE facility between Collin College and McKinney ISD.
School buses are aging out of safe service.Replace buses on a planned schedule.
Repairs, buses and equipment are paid from the classroom budget.Free more than $28 million a year for salaries and classrooms.
PROP C · INSTRUCTIONAL TECHNOLOGY EQUIPMENT – $62 MILLION
Network equipment and student devices are at the end of their lifecycle.Upgrade district technology devices.
Student devices wear out faster than they are replaced.Replace devices on a regular cycle.
PROP D · EXISTING McKINNEY HIGH SCHOOL TRAINING POOL – $4.5 MILLION
The training pool built in 1986 is scheduled for maintenance capital repairs.Repair pool cracks and pool systems.
PROP E · McKINNEY ISD STADIUMS – $2.55 MILLION
Turf at the existing MISD stadium is aging and scheduled for replacement.Replace the turf at the existing MISD stadium.
The track at the existing Ron Poe stadium is cracking and deteriorating.Resurface track at Ron Poe stadium.

In August 2026, McKinney ISD lowered the total tax rate by almost 4 cents. All five propositions can be funded with that lower rate. If all five propositions pass, the total rate will still be lower than last year.

Banner: "Learn more about the election at mckinneyisd.com"

The mailer is listed on the Sources page. For the district's own election pages, see the district's bond page.

Last updated: