The district's Election 2026 mailer
This is the printed "Election 2026" mailer that McKinney ISD sent to voters by mail. This site quotes it for the district's own wording. It is the district's material, not this site's.
This site's copy was made from the printed mailer. Both sides are shown as printed, including the photographs, except that the mailing barcode on the front is covered with a gray bar. A plain-text version of each side follows each image.
Front
Text of the front
McKinney ISD Election 2026
- Upgraded Facilities
- Safety and Security
- Growth
- With a Lower Tax Rate!
A PLAN DEVELOPED BY OUR COMMUNITY
- CUT BUDGET $15 MILLION. McKinney ISD made budget and efficiency adjustments before bringing anything to voters.
- MISD ADMINISTRATIVE COSTS run about HALF the statewide average.
Key Dates
- October 5: Last day to register to vote
- October 19: Early voting begins
- October 30: Early voting ends
- November 3: Election Day
"Para obtener más información sobre el Bono 2026 y las elecciones, visite mckinneyisd.net." "Learn more about Election 2026" (with a QR code).
5 Proposition Plan
- In August 2026, McKinney ISD lowered the total tax rate by almost 4 cents.
- All five propositions can be funded with that lower rate.
- If all five propositions pass, the total rate will still be lower than last year.
| Ballot | What it's called | Amount | What it funds |
|---|---|---|---|
| Prop A | Ratifies a tax rate of $1.0664 | M&O rate | Teacher salaries and classroom programs |
| Prop B | Schools, Safety & Buses | $430.95 million | Renovations, safety & security, two new elementary schools, CTE Center, buses and district vehicles |
| Prop C | Instructional Technology Equipment | $62 million | Network equipment and replacement of worn out student devices |
| Prop D | Existing McKinney High School Training Pool | $4.5 million | Pool repairs at existing facility |
| Prop E | McKinney ISD Stadiums | $2.55 million | Replacement of aging stadium turf & track resurfacing |
Back
Text of the back
THE DISTRICT LOWERED THE TAX RATE. VOTER APPROVAL FUNDS THE PROJECTS
| Currently in McKinney ISD | Bond / VATRE 2026 will |
|---|---|
| PROP A · VATRE – TEACHERS & CLASSROOMS | |
| McKinney ISD's teacher compensation is compared annually with neighboring and peer school districts. | Fund teacher salaries. |
| After cutting $15 million from the budget, a $6 million deficit remains. | Close the final gap without cutting more teachers or student programs. |
| Class sizes have grown and campus staff has been reduced. | Fund salaries for teachers, counselors and instructional aides. |
| Academic programs and student support services are at risk. | Fund the programs and services families rely on every day. |
| Without additional revenue, the district may need to consider further reductions, including transportation services and student programs. | Maintain transportation and student programs. |
| PROP B · SCHOOLS, SAFETY & BUSES – $430.95 MILLION | |
| HVAC, roofing, electrical and plumbing are past their service life. | Replace building systems. |
| Emergency repairs cost more than planned replacement. | Fund scheduled replacement instead of crisis repair. |
| Surveillance cameras, servers and alert systems are outdated. | Upgrade cameras, alerts and emergency communications. |
| Aging air conditioning, windows, lighting and roofs waste energy. | Install efficient systems that lower operating costs. |
| Frazier, Press and Webb Elementary are at or over capacity. | Build two new elementary schools where growth is happening. |
| Duplicating career training programs at each high school is more expensive and less efficient. | Build one shared CTE Center with Collin College. |
| Collin College was planning a separate CTE facility nearby. | Shared CTE facility between Collin College and McKinney ISD. |
| School buses are aging out of safe service. | Replace buses on a planned schedule. |
| Repairs, buses and equipment are paid from the classroom budget. | Free more than $28 million a year for salaries and classrooms. |
| PROP C · INSTRUCTIONAL TECHNOLOGY EQUIPMENT – $62 MILLION | |
| Network equipment and student devices are at the end of their lifecycle. | Upgrade district technology devices. |
| Student devices wear out faster than they are replaced. | Replace devices on a regular cycle. |
| PROP D · EXISTING McKINNEY HIGH SCHOOL TRAINING POOL – $4.5 MILLION | |
| The training pool built in 1986 is scheduled for maintenance capital repairs. | Repair pool cracks and pool systems. |
| PROP E · McKINNEY ISD STADIUMS – $2.55 MILLION | |
| Turf at the existing MISD stadium is aging and scheduled for replacement. | Replace the turf at the existing MISD stadium. |
| The track at the existing Ron Poe stadium is cracking and deteriorating. | Resurface track at Ron Poe stadium. |
In August 2026, McKinney ISD lowered the total tax rate by almost 4 cents. All five propositions can be funded with that lower rate. If all five propositions pass, the total rate will still be lower than last year.
Banner: "Learn more about the election at mckinneyisd.com"
The mailer is listed on the Sources page. For the district's own election pages, see the district's bond page.
Last updated: